Some of this is a little delayed, but I finally had a chance to load a few pictures of the shop re-build into my lap top. This picture shows the floor removed and the dirt being prepared to receive the rebar for the pylons and grade beams.
This view is looking out of the shop toward the door of the shop. All of the iron work is in place and ready for the pouring of the concrete.
At last the new floor is in place. The next step will be to remove the rotted wood in preparation of framing, and roofing.
Now the fun begins. Here is the roof that I helped to build when I was 9 years old being removed.